West Bay,
State Of Qatar, Doha
Welcome To Uni Gulf Contracting & Trading
Call Us
Mobile: (+974) 30145587
Phone: (+974) 44434523
info@unigulfqatar.com
Location
The high security walls we use in our data centre installation projects are approved for HM Government use, have passed rigorous testing by the Loss Prevention Certification Board, and are designed to withstand experienced attempts at forced entry for up to 30 minutes. It can easily resist sledgehammers, disc grinders and drills, as well as 19mm and 357 Calibre handguns. As a data centre is the brain of your business, it can be a high value target. Our data centre high security walls are designed to prevent unauthorised access, both casual and determined, mitigating this risk. Our data centre installation team can fit security walls as either a prime barrier, or retro fit an internal secondary barrier.
The high security walls our data centre installation team use are weather and water resistant, making them suitable for internal and external applications. They can be deployed as a ‘standalone’ wall or partition, or as a complete modular secure enclosure. The secure wall panels are also pre-finished, negating the need for wet or hot trade requirements, providing a substantial saving of materials, turnaround time and labour compared to more traditional building methods, and are available in a wide range of core types to satisfy insulation and fire rating requirements. The high security walls are quick and easy to install within a data centre, with minimal disruption to a site’s day to day operations. We are officially authorised SECURICLAD installers, giving you the piece of mind that your high security walls are fully protecting your data centre protected from forced entry.